Direct answer
Published 11/10/2026, 4:23:47 PM
Bitdeer's record Q3 2025 revenue of $169.7M (up 173.6% YoY vs. $62.0M) came from real operating expansion — chiefly self-mining growth, first external ASIC sales, and gross profitability across all four segments — while the widened $266.7M net loss (vs. $50.1M) was dominated by non-cash derivative losses on convertible notes, not the core mining business.
What drove the record revenue
| Driver | Detail | Period |
|---|---|---|
| Total revenue | $169.7M, +173.6% YoY (vs. $62.0M Q3 2024) | Q3 2025 |
| Self-mining revenue | $130.9M, +306% YoY and +28.7% sequential | Q3 2025 |
| Gross profit | $40.8M (vs. $2.8M Q3 2024), gross margin 24.1% | Q3 2025 |
| Adjusted EBITDA | $43.0M (vs. −$7.9M a year earlier) | Q3 2025 |
1. Self-mining expansion (primary driver). Self-mining revenue reached $130.9M in Q3 2025, up 306% YoY and 28.7% sequentially [Note: not independently confirmed — the Q3 2025 press release confirms total revenue of $169.7M but does not break out self-mining revenue; attribution remains to Bitdeer's IR filing]. This was powered by an increase in average operating hashrate: Bitdeer reported reaching 41.2 EH/s of self-mining capacity by end of October 2025, and energized 361 MW of datacenter capacity for self-mining. [Contested: the 361 MW figure dates to end of Q2 (June 30, 2025) per Bitdeer's Q2 2025 release — https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-reports-unaudited-financial-results-second-quarter-2025. The 46% increase to 14.2 EH/s occurred in Q2 2025, not Q3, per the Q2 2025 earnings call transcript — https://ir.bitdeer.com/static-files/02e2d4ff-ab07-4cc0-829e-e6dcff7e4d06.]
2. SEALMINER ASIC commercial sales. Mass production of SEALMINER ASICs enabled external sales — Bitdeer sold and shipped 5.3 EH/s of SEALMINER A2 rigs to external customers and recognized revenue on those sales. The company also commenced SEALMINER A3 mass production during the quarter, with early SEAL04 samples demonstrating 6–7 J/TH power efficiency at chip level.
3. All four segments turned gross-profitable. Every major reporting segment generated a gross profit, lifting gross profit to $40.8M and adjusted EBITDA to a positive $43.0M.
What caused the widening net loss
| Item | Q3 2025 | Q3 2024 | Q2 2025 |
|---|---|---|---|
| "Other net loss" (derivative losses on convertibles) | $238.5M | $14.7M | $108.5M |
| Net loss | $266.7M | $50.1M | — |
1. Non-cash derivative losses on convertible senior notes (dominant). "Other net loss" hit $238.5M vs. $14.7M a year earlier — attributed to non-cash derivative losses on the convertible senior notes. Under IFRS, the fair-value remeasurement of these embedded derivatives flows through the income statement even though no cash changes hands.
2. Higher operating expenses. The operating loss widened due to higher R&D costs tied to the SEALMINER roadmap, higher G&A, and increased financing costs.
3. Balance-sheet strain. The report shows $196.3M cash vs. $824.3M borrowings and $672.5M in convertible notes, with $520M of operating cash used — reflecting heavy capex into the AI/datacenter buildout.
Market reaction and caveats
Despite beating revenue estimates, BTDR shares fell ~20% on Nov 11, 2025, because the net loss was wider than expected and the company announced an ASIC chip delay amid an uncertain AI rollout. The $266.7M loss is largely non-cash (derivative mark-to-market), so it does not reflect cash-burning operations — adjusted EBITDA was positive at $43.0M — but the $520M operating cash outflow and $824.3M borrowings indicate significant real cash consumption from the infrastructure buildout.
Conclusion
Revenue growth and the widened loss had decoupled drivers: self-mining expansion, first external SEALMINER ASIC sales, and broad-based gross profitability lifted revenue, while a $238.5M non-cash derivative loss on convertible notes produced most of the $266.7M net loss. What remains open: the full per-segment revenue split and the self-mining revenue figure per se were not independently confirmed, and some hashrate/capacity figures (14.2 EH/s, 361 MW) technically belong to Q2 2025 rather than Q3.